Material Requirements Planning
(MRP)
The EnterpriseIQ MRP II engine accurately and effectively
manages all resources necessary to meet manufacturing demand, while
maintaining lean inventory levels. It includes items manufactured
internally, through third party vendors, as well as sub-assemblies.
The single database structure allows the EnterpriseIQ MRP engine
to span the entire supply chain to accurately match availability
with demand. The fully incorporated system takes into account all
aspects of the manufacturing process including:
- Labor Capacity Planning - Measure standard labor hours
against the required hours to meet your schedule by week, day
or shift, based on work orders and labor schedule.
- Auxiliary Equipment Planning - Checks for availability
of auxiliary equipment linked to the bill of material.
- Material Planning - Evaluate material availability based
on the required manufacturing date taking into consideration material
lead times.
- Machine Capacity Planning - Evaluates machine availability
with variables that affect the capacity such as maintenance, setup,
etc. If the job cannot be run within the requested time frame
due to capacity limits, the system determines the first available
time and date the work center can have the requested number of
items completed.
- Rough Cut Capacity Planning - Compares available work
center time based on the Shop Calendar versus required hours for
each machine type.
|